1 ARC Chute FOR H1 H2 HA MTZ1 (LV846737SP)
Schneider Electric

1 ARC Chute FOR H1 H2 HA MTZ1

Part numberLV846737SPEAN / GTIN3606481186911HS code8536.90
Electrical Components
Circuit Breaker Accessories
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Schneider Electric LV846737SP Gnistkammerdeksel for H1/H2 and HA Masterpact circuit breaker MTZ1, spare part.

Technical Specifications

Manufacturer part number (MPN)
LV846737SP
EAN / GTIN
3606481186911
HS code
8536.90
Sales unit
pcs
Package quantity
8 pcs
Range
MasterPact
Product or component type
Arc chute
Accessory / separate part category
Electrical accessory
Range compatibility
Masterpact MasterPact MTZ1
Breaking capacity code
H1; H2; HA
Circuit breaker CT rating
1250 A; 1600 A; 630 A; 1000 A; 800 A
Poles description
3P; 4P
Offer type
Spare part
Country of origin
FR
Warranty (in months)
18

Standards & Compliance

HS Code
8536.90

Cross References

  • EAN 3606481186911
  • SAP 1200498130
  • Code 82621867

Product Documentation

Document preview: Schneider Electric LV846737SP — OEM Product Page

Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy LV846737SP?
LV846737SP can be ordered from cballast.com as a Schneider Electric catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Schneider Electric product?
The manufacturer part number is LV846737SP.
What is the HS code for LV846737SP?
The customs tariff (HS) code for LV846737SP is 8536.90.
Who manufactures LV846737SP?
LV846737SP is a Schneider Electric product in the Electrical Components range.
Is a datasheet available for LV846737SP?
Yes — the LV846737SP datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for LV846737SP?
The minimum order quantity is 1.
Is LV846737SP available?
Yes — LV846737SP is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).