EV Canalis KS kit 7,4kW RDCB (EVK8KS2PB40)
Schneider Electric

EV Canalis KS kit 7,4kW RDCB

Part numberEVK8KS2PB40EAN / GTIN3606482005785HS code8536.20
Electrical Components
Busbar Systems
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Schneider Electric EVK8KS2PB40 Outlet Box with protection for EVlink-mounting on Canalis KS-rail for 7,4 kW charging station-2P-40A.

Technical Specifications

Manufacturer part number (MPN)
EVK8KS2PB40
EAN / GTIN
3606482005785
Sales unit
pcs
Power
7.4 kW
Colour
White
Width
133 mm
Height
220 mm
RAL-number
9001
With locking
No
Protection
Miniature circuit breaker (MCB)
Number of conductors (without earthing)
4
Phase selection
No
Number of poles
4
Length
444 mm
Degree of protection (IP)
IP55
Branch off type
Pipe in-lead
Rated voltage AC 50 Hz
400 V
Rated current AC 50 Hz
40 A
Country of origin
France

Standards & Compliance

HS Code
8536.20

Cross References

  • EAN 3606482005785
  • SAP 1200722088
  • Code 83846426

Product Documentation

Document preview: Schneider Electric EVK8KS2PB40 — OEM Product Page

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy EVK8KS2PB40?
EVK8KS2PB40 can be ordered from cballast.com as a Schneider Electric catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Schneider Electric product?
The manufacturer part number is EVK8KS2PB40.
What is the HS code for EVK8KS2PB40?
The customs tariff (HS) code for EVK8KS2PB40 is 8536.20.
Who manufactures EVK8KS2PB40?
EVK8KS2PB40 is a Schneider Electric product in the Electrical Components range.
Is a datasheet available for EVK8KS2PB40?
Yes — the EVK8KS2PB40 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for EVK8KS2PB40?
The minimum order quantity is 1.
Is EVK8KS2PB40 available?
Yes — EVK8KS2PB40 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).