IMI FPL Support Sleeve - 22mm, 22mm
Imi

IMI FPL Support Sleeve - 22mm, 22mm

Part number53320022EAN / GTIN7318793763600HS code7412.20
Pipes, Fittings & Flanges
Press & Push-Fit Fittings
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

IMI FPL Support Sleeve. Push and compression fittings (Plumbing / Pipes and fittings). Principal data: pipe dimension 1 22 mm, pipe dimension 2 22 mm. Supplied under manufacturer part number 53320022, EAN 7318793763600, HS code 7412.20, country of origin Sweden.

Technical Specifications

Product type
Push and compression fittings
Product group
Pipes and fittings
Pipe dimension 1
22 mm
Pipe dimension 2
22 mm
Pressure PN
16 bar
Material
Metal
Used for
Soft copper pipe
Sales unit
Pack
Carbon footprint (EPD)
0.0598 kg CO2e per pcs
Environmental declaration
EPD third-party verified
Country of origin
Sweden
Customs tariff code (EU CN)
74122000
HS code
7412.20
Manufacturer part number
53320022
GTIN (EAN)
7318793763600
VVS number
044421022

Standards & Compliance

HS Code
7412.20

Cross References

  • EAN 7318793763600
  • MPN 53320022

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 53320022?
53320022 can be ordered from cballast.com as a Imi catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Imi product?
The manufacturer part number is 53320022.
What is the HS code for 53320022?
The customs tariff (HS) code for 53320022 is 7412.20.
Who manufactures 53320022?
53320022 is a Imi product in the Pipes, Fittings & Flanges range.
Is a datasheet available for 53320022?
Yes — the 53320022 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 53320022?
The minimum order quantity is 1.
Is 53320022 available?
Yes — 53320022 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).