IMI FPL Coupling with sleeve/nipple - 3/8", 3/8"
Imi

IMI FPL Coupling with sleeve/nipple - 3/8", 3/8"

Part number53356210EAN / GTIN7318793636300HS code7412.20
Pipes, Fittings & Flanges
Press & Push-Fit Fittings
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

IMI FPL Coupling with sleeve/nipple. FPL connections (Plumbing / Pipes and fittings / Push and compression fittings). Principal data: thread 1 3/8", thread 2 3/8". Supplied under manufacturer part number 53356210, EAN 7318793636300, HS code 7412.20, country of origin Sweden.

Technical Specifications

Product type
FPL connections
Product group
Pipes and fittings
Thread 1
3/8"
Thread 2
3/8"
Surface
Chrome-plated
Material
Metal
Pressure PN
16 bar
Sales unit
Pack
Carbon footprint (EPD)
0.1195 kg CO2e per pcs
Environmental declaration
EPD third-party verified
Country of origin
Sweden
Customs tariff code (EU CN)
74122000
HS code
7412.20
Manufacturer part number
53356210
GTIN (EAN)
7318793636300
VVS number
044224012

Standards & Compliance

HS Code
7412.20

Cross References

  • EAN 7318793636300
  • MPN 53356210

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 53356210?
53356210 can be ordered from cballast.com as a Imi catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Imi product?
The manufacturer part number is 53356210.
What is the HS code for 53356210?
The customs tariff (HS) code for 53356210 is 7412.20.
Who manufactures 53356210?
53356210 is a Imi product in the Pipes, Fittings & Flanges range.
Is a datasheet available for 53356210?
Yes — the 53356210 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 53356210?
The minimum order quantity is 1.
Is 53356210 available?
Yes — 53356210 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).