
Eaton
Door double G2 SbS 6-Row 106 - 150 mm
Part numberEP-501150EAN / GTIN9010653037279HS code8538.90
Enclosures
Enclosure Accessories
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Eaton EP-501150 DDF-72/6R-4-SBS-F.
Technical Specifications
- Manufacturer part number (MPN)
- EP-501150
- EAN / GTIN
- 9010653037279
- Sales unit
- pcs
- Type of accessory/spare part
- Door
- Accessory
- No
- Spare part
- Yes
- Country of origin
- Czechia
Standards & Compliance
- HS Code
- 8538.90
Cross References
- EAN 9010653037279
- SAP 1200620242
- Code 83032608
Product Documentation
Document preview: Door double G2 SbS 6-Row 106 - 150 mm (EP-501150) — Specification sheet
More from Eaton

Eaton
Front plate xE Light (XLMFGC358)

Eaton
Front plate modular screw H150 B400 xE B
BPZ-FP-S-400/150-45

Eaton
Eaton IZMX-MIL32C-W40-1

Eaton
Variable-frequency drive 690V 110 kW
SPX125A1-5A4N1

Eaton
Cabinet H×W×D=1800X1000X500MM (XVTL-MP/BX/IC-10/5/18)

Eaton
Front plate xE Light (XLMFGC24)

Eaton
Mounting Set for NZM1, Vertical, H × W 300 × 400 mm
BPZ-NZM1/MSW-400-MV

Eaton
Selector Switch (T0-3-8401/EZ)
Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy EP-501150?
- EP-501150 can be ordered from cballast.com as a Eaton catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Eaton product?
- The manufacturer part number is EP-501150.
- What is the HS code for EP-501150?
- The customs tariff (HS) code for EP-501150 is 8538.90.
- Who manufactures EP-501150?
- EP-501150 is a Eaton product in the Enclosures range.
- Is a datasheet available for EP-501150?
- Yes — the EP-501150 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for EP-501150?
- The minimum order quantity is 1.
- Is EP-501150 available?
- Yes — EP-501150 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
