Busbar 3 6 mod 10 mm² (EP-501075)
Eaton

Busbar 3 6 mod 10 mm²

Part numberEP-501075EAN / GTIN9010653035190HS code8544.42
Electrical Components
Busbar Systems
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Eaton EP-501075 EVGK-3PHAS/6MODULE.

Technical Specifications

Manufacturer part number (MPN)
EP-501075
EAN / GTIN
9010653035190
Sales unit
pcs
Package quantity
20 pcs
Conductor cross-section
10 mm²
Colour
Grey
Insulated
Yes
Number of phases
3
Cross section
10 mm²
Rated permanent current Iu
63 A
Number of poles
3
Length
106 mm
Conditioned rated short-circuit current Iq
25 kA
Width in number of modular spacings
6
Rated surge voltage
4 kV
Type of electric connection
Fork
Suitable for devices with auxiliary switch
No
Suitable for devices with N-conductor
No
Suitable for number of devices
2
Max. rated operation voltage Ue
400 V
Module width
17.8 mm
Can be cut to size
Yes
Country of origin
China

Standards & Compliance

HS Code
8544.42

Cross References

  • EAN 9010653035190
  • SAP 1200627203
  • Code 83034774

Product Documentation

Document preview: Busbar 3 6 mod 10 mm² (EP-501075) — Specification sheet

Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy EP-501075?
EP-501075 can be ordered from cballast.com as a Eaton catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Eaton product?
The manufacturer part number is EP-501075.
What is the HS code for EP-501075?
The customs tariff (HS) code for EP-501075 is 8544.42.
Who manufactures EP-501075?
EP-501075 is a Eaton product in the Electrical Components range.
Is a datasheet available for EP-501075?
Yes — the EP-501075 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for EP-501075?
The minimum order quantity is 1.
Is EP-501075 available?
Yes — EP-501075 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).