Vitillo B5K Cap steel zinc/nickel - 5/8", 4SP, 4SH, R12, Everest 5000, Teknospir 4SP
Vitillo

Vitillo B5K Cap steel zinc/nickel - 5/8", 4SP, 4SH, R12, Everest 5000, Teknospir 4SP

Part numberZ-B5K10EAN / GTIN8050878316798HS code7307.92
Hydraulics
Hydraulic Fittings
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Vitillo B5K Cap steel zinc/nickel. Two-piece dressers (Technique / Hydraulics / Press fittings). Principal data: hose size 5/8", used for 4SP, 4SH, R12, Everest 5000, Teknospir 4SP. Supplied under manufacturer part number Z-B5K10, EAN 8050878316798, HS code 7307.92, country of origin Italy.

Technical Specifications

Product type
Two-piece dressers
Product group
Hydraulics
Hose size
5/8"
Used for
4SP, 4SH, R12, Everest 5000, Teknospir 4SP
Length
40 mm
Outer diameter
40.5 mm
Sales unit
Pack
Carbon footprint (EPD)
0.3860 kg CO2e per pcs
Country of origin
Italy
Customs tariff code (EU CN)
73079210
HS code
7307.92
Manufacturer part number
Z-B5K10
GTIN (EAN)
8050878316798

Standards & Compliance

HS Code
7307.92

Cross References

  • EAN 8050878316798
  • MPN Z-B5K10

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy Z-B5K10?
Z-B5K10 can be ordered from cballast.com as a Vitillo catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Vitillo product?
The manufacturer part number is Z-B5K10.
What is the HS code for Z-B5K10?
The customs tariff (HS) code for Z-B5K10 is 7307.92.
Who manufactures Z-B5K10?
Z-B5K10 is a Vitillo product in the Hydraulics range.
Is a datasheet available for Z-B5K10?
Yes — the Z-B5K10 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for Z-B5K10?
The minimum order quantity is 1.
Is Z-B5K10 available?
Yes — Z-B5K10 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).