Uponor Ultra Rib 2 Sewer Pipe with socket PP PP - 450mm, SN8, 6000mm
Uponor

Uponor Ultra Rib 2 Sewer Pipe with socket PP PP - 450mm, SN8, 6000mm

Part number1103075EAN / GTIN6414905523092HS code3917.22
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Uponor Ultra Rib 2 Sewer Pipe with socket PP PP. Lightweight pipe (VA / Sewer pipes and fittings / Lightweight pipes and fittings). Principal data: outer diameter 450 mm, ring stiffness SN8, length 6000 mm. Supplied under manufacturer part number 1103075, EAN 6414905523092, HS code 3917.22, country of origin Sweden.

Technical Specifications

Product type
Lightweight pipe
Product group
Sewer pipes and fittings
Outer diameter
450 mm
Ring stiffness
SN8
Length
6000 mm
Color
Red-brown
Sales unit
Bundle
Carbon footprint (EPD)
157.9410 kg CO2e per pcs
Environmental declaration
EPD third-party verified
Country of origin
Sweden
Customs tariff code (EU CN)
39172210
HS code
3917.22
Manufacturer part number
1103075
GTIN (EAN)
6414905523092
VVS number
191106460

Standards & Compliance

HS Code
3917.22

Cross References

  • MPN 1103075
  • EAN 6414905523092
  • VVS 191106460

Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 1103075?
1103075 can be ordered from cballast.com as a Uponor catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Uponor product?
The manufacturer part number is 1103075.
What is the HS code for 1103075?
The customs tariff (HS) code for 1103075 is 3917.22.
Who manufactures 1103075?
1103075 is a Uponor product in the Pipes, Fittings & Flanges range.
Is a datasheet available for 1103075?
Yes — the 1103075 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 1103075?
The minimum order quantity is 1.
Is 1103075 available?
Yes — 1103075 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).