Uponor Ultra Double Sewer Pipe with socket PP - 400mm, SN8, 6000mm
Uponor

Uponor Ultra Double Sewer Pipe with socket PP - 400mm, SN8, 6000mm

Part number1143797EAN / GTIN6414902266671HS code3917.22
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Uponor Ultra Double Sewer Pipe with socket PP. Lightweight pipe (VA / Sewer pipes and fittings / Lightweight pipes and fittings). Principal data: outer diameter 400 mm, ring stiffness SN8, length 6000 mm. Supplied under manufacturer part number 1143797, EAN 6414902266671, HS code 3917.22, country of origin Finland.

Technical Specifications

Product type
Lightweight pipe
Product group
Sewer pipes and fittings
Outer diameter
400 mm
Ring stiffness
SN8
Length
6000 mm
Color
Red-brown/grey
Sales unit
Bundle
Carbon footprint (EPD)
101.8350 kg CO2e per pcs
Environmental declaration
EPD third-party verified
Country of origin
Finland
Customs tariff code (EU CN)
39172210
HS code
3917.22
Manufacturer part number
1143797
GTIN (EAN)
6414902266671
VVS number
191198660

Standards & Compliance

HS Code
3917.22

Cross References

  • MPN 1143797
  • EAN 6414902266671
  • VVS 191198660

Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 1143797?
1143797 can be ordered from cballast.com as a Uponor catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Uponor product?
The manufacturer part number is 1143797.
What is the HS code for 1143797?
The customs tariff (HS) code for 1143797 is 3917.22.
Who manufactures 1143797?
1143797 is a Uponor product in the Pipes, Fittings & Flanges range.
Is a datasheet available for 1143797?
Yes — the 1143797 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 1143797?
The minimum order quantity is 1.
Is 1143797 available?
Yes — 1143797 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).