
Toughbuilt
Sheet Metal Shears left-hand Toughbuilt
Part numberTB-H4-60-LEAN / GTIN1210001301160HS code8205.59
Tools
Hand Tools
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Toughbuilt TB-H4-60-L Sheet Metal Shears left-hand Toughbuilt.
Technical Specifications
- Manufacturer part number (MPN)
- TB-H4-60-L
- EAN / GTIN
- 1210001301160
- Sales unit
- pcs
Standards & Compliance
- HS Code
- 8205.59
Cross References
- EAN 1210001301160
- SAP 1200793359
- Code 83973350
Product Documentation
Document preview: Sheet Metal Shears left-hand Toughbuilt (TB-H4-60-L) — Specification sheet
More from Toughbuilt

Toughbuilt
Tool bag Electrician Small ClipTech
TB-CT-34

Toughbuilt
Toughbuilt ClipTech Tool Pouch with Hammer Holder
TB-CT-24

Toughbuilt
Toughbuilt Journeyman EL ClipTech Tool Bag
TB-CT-114

Toughbuilt
Toughbuilt Technician Large ClipTech Tool Bag
8818053

Toughbuilt
Hammerholder ToughBuilt (TB-52)

Toughbuilt
Drillholder Compact Small ClipTech
TB-CT-20-S

Toughbuilt
Knife Scraper Utility + 5 blades
TB-H4S5-01

Toughbuilt
Hub 3 pcs ClipTech StackTech
TB-B1S3-A-50
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy TB-H4-60-L?
- TB-H4-60-L can be ordered from cballast.com as a Toughbuilt catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Toughbuilt product?
- The manufacturer part number is TB-H4-60-L.
- What is the HS code for TB-H4-60-L?
- The customs tariff (HS) code for TB-H4-60-L is 8205.59.
- Who manufactures TB-H4-60-L?
- TB-H4-60-L is a Toughbuilt product in the Tools range.
- Is a datasheet available for TB-H4-60-L?
- Yes — the TB-H4-60-L datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for TB-H4-60-L?
- The minimum order quantity is 1.
- Is TB-H4-60-L available?
- Yes — TB-H4-60-L is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
