
Solid Gear
Safety Shoes Revolution 2 48
Part numberSG7600948EAN / GTIN7340093627474HS code6403.40
Safety & Detection
PPE Safety Footwear
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Solid Gear SG7600948 SAFETY SHOES REVOLUTION 2 48.
Technical Specifications
- Manufacturer part number (MPN)
- SG7600948
- EAN / GTIN
- 7340093627474
- Sales unit
- pcs
Standards & Compliance
- HS Code
- 6403.40
Cross References
- EAN 7340093627474
- SAP 1201007860
- Code 84362952
Product Documentation
Document preview: Safety Shoes Revolution 2 48 (SG7600948) — Specification sheet
More from Solid Gear

Solid Gear
Safety Shoes Vapor 3 GTX LOW 38
SG80018048338

Solid Gear
Safety Shoes Vapor 3 GTX LOW 39
SG80018048339

Solid Gear
Safety Shoes Vapor 3 GTX LOW 46
SG80018048346

Solid Gear
Safety Shoes REVO 3 AIR LOW Black 48
SG78001047048

Solid Gear
Safety Shoes REVO 3 AIR LOW Black/Yellow 48
SG78001049248

Solid Gear
Safety Shoes Vapor 3 GTX LOW 37
SG80018048337

Solid Gear
Safety Shoes Vapor 3 GTX LOW 48
SG80018048348

Solid Gear
Safety Shoes Vapor 3 GTX LOW 47
SG80018048347
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy SG7600948?
- SG7600948 can be ordered from cballast.com as a Solid Gear catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Solid Gear product?
- The manufacturer part number is SG7600948.
- What is the HS code for SG7600948?
- The customs tariff (HS) code for SG7600948 is 6403.40.
- Who manufactures SG7600948?
- SG7600948 is a Solid Gear product in the Safety & Detection range.
- Is a datasheet available for SG7600948?
- Yes — the SG7600948 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for SG7600948?
- The minimum order quantity is 1.
- Is SG7600948 available?
- Yes — SG7600948 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
