Cable FOR INTGR, A INN M221 1M (TMACBL1)
Schneider Electric

Cable FOR INTGR, A INN M221 1M

Part numberTMACBL1EAN / GTIN3606480611353HS code8544.42
Control & Automation
PLC Accessories
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Schneider Electric TMACBL1 Accessories Modicon PLS - Cable for connection of analog in on M221.

Technical Specifications

Manufacturer part number (MPN)
TMACBL1
EAN / GTIN
3606480611353
HS code
8544.42
Sales unit
pcs
Package quantity
100 pcs
Accessory / separate part type
Connection cable
Range compatibility
Modicon M221
Accessory / separate part destination
Integrated analogue input
Electrical connection
1 male connector, 4 ways for controller side; 1 free end with flying leads
Cable length
1 m
Product weight
0.024 kg
Number of Units in Package 1
1
Number of Units in Package 2
100
Number of Units in Package 3
1600
Country of origin
CN
Warranty (in months)
18

Standards & Compliance

HS Code
8544.42

Cross References

  • EAN 3606480611353
  • SAP 1000601519
  • Code 8233018

Product Documentation

Document preview: Schneider Electric TMACBL1 — OEM Product Page

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy TMACBL1?
TMACBL1 can be ordered from cballast.com as a Schneider Electric catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Schneider Electric product?
The manufacturer part number is TMACBL1.
What is the HS code for TMACBL1?
The customs tariff (HS) code for TMACBL1 is 8544.42.
Who manufactures TMACBL1?
TMACBL1 is a Schneider Electric product in the Control & Automation range.
Is a datasheet available for TMACBL1?
Yes — the TMACBL1 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for TMACBL1?
The minimum order quantity is 1.
Is TMACBL1 available?
Yes — TMACBL1 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).