Rockwool Conlit Fire Sleeve - 42mm, 19mm, 1000mm
Rockwool

Rockwool Conlit Fire Sleeve - 42mm, 19mm, 1000mm

Part number1604816EAN / GTIN4003446683932HS code6806.10
Insulation & Lagging
Pipe Insulation
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Rockwool Conlit Fire Sleeve. Passiv brand (Plumbing / Brand materials). Principal data: inner diameter 42 mm, insulation thickness 19 mm, length 1000 mm. Supplied under manufacturer part number 1604816, EAN 4003446683932, HS code 6806.10, country of origin Germany.

Technical Specifications

Product type
Passiv brand
Product group
Brand materials
Inner diameter
42 mm
Insulation thickness
19 mm
Length
1000 mm
Fire class
DIN 4102 A1
Temperature max
250 °C
Material
Alufoliebelagt mineraluld
Approval
MK 6.10/1674
Sales unit
m, Pack
Carbon footprint (EPD)
1.7159 kg CO2e per M
Country of origin
Germany
Customs tariff code (EU CN)
68061000
HS code
6806.10
Manufacturer part number
1604816
GTIN (EAN)
4003446683932
VVS number
494373164

Standards & Compliance

HS Code
6806.10

Cross References

  • EAN 4003446683932
  • MPN 1604816

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 1604816?
1604816 can be ordered from cballast.com as a Rockwool catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Rockwool product?
The manufacturer part number is 1604816.
What is the HS code for 1604816?
The customs tariff (HS) code for 1604816 is 6806.10.
Who manufactures 1604816?
1604816 is a Rockwool product in the Insulation & Lagging range.
Is a datasheet available for 1604816?
Yes — the 1604816 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 1604816?
The minimum order quantity is 1.
Is 1604816 available?
Yes — 1604816 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).