Beijer Ref
Image not available for this product
Beijer Ref
PFXP Installation Cable 4 × 1.5 mm² + Earth, 50 m Coil
Part number1018590HS code8544.49
Cables & Wiring
Installation Cables
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
PFXP installation cable, 4 conductors + earth, 1.5 mm², supplied as a 50 m coil. Part number 1018590.
Technical Specifications
- Product description
- PFXP cable 4 + earth, 1.5 mm², 50 m coil
- Part number
- 1018590
Standards & Compliance
- HS Code
- 8544.49
More from Beijer Ref

Beijer Ref
Flare/Solder Adapter FAS-2 L6 CM SAE 3/8" × 3/8"
315030

Beijer Ref
Flare/Solder Adapter FAS-6 L6 CM SAE 7/8" × 7/8"
315070

Beijer Ref
Motorised Zone Valve DN32, 2-Way, Brine to −15 °C
3030
No image
Beijer Ref
Repair Socket, Pack of 5 (MPA5275L0030001)

Beijer Ref
Ball Valve 5/8" ODS with Schrader Port, REF1.1.S.B.N16.3.60
SV21B016R0000

Beijer Ref
CD360H (rel + ch)

Beijer Ref
CD750M (ch)

Beijer Ref
CD1400H (ch)
Catalogue entry last verified: 2026-10-03.
Frequently asked questions
- Where can I buy 1018590?
- 1018590 can be ordered from cballast.com as a Beijer Ref catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Beijer Ref product?
- The manufacturer part number is 1018590.
- What is the HS code for 1018590?
- The customs tariff (HS) code for 1018590 is 8544.49.
- Who manufactures 1018590?
- 1018590 is a Beijer Ref product in the Cables & Wiring range.
- What is the minimum order quantity for 1018590?
- The minimum order quantity is 1.
- Is 1018590 available?
- Yes — 1018590 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
- How do I get a price for 1018590?
- Request a quotation with the quote button on this page or by email to sales@cballast.com — we reply within 24 hours with price, availability and lead time.
