Pipe Insulation Foam 22mm ID 13mm Wall 2M
Armacell

Pipe Insulation Foam 22mm ID 13mm Wall 2M

Part numberPIPEINS-22X13HS code6806.90
EN 13501-1 (Class B-s3,d0), FM, CE, LR, DNV, BV
Insulation & Lagging
Pipe Insulation
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Armacell PIPEINS-22X13 Closed cell foam pipe insulation. 22mm ID 13mm wall. Approvals: EN 13501-1 (Class B-s3,d0), FM, CE, LR, DNV, BV. Fits listed models.

Technical Specifications

Approval
EN 13501-1 (Class B-s3,d0), FM, CE, LR, DNV, BV
Standards
EN 13501-1
Approvals
DNV, BV, LR, CE
HS code
6806.90

Standards & Compliance

Classification / Approval
EN 13501-1 (Class B-s3,d0), FM, CE, LR, DNV, BV
HS Code
6806.90

Compatibility & Fitment

Fits listed models. For cross-compatibility or older models, contact us with your part number or serial number.

Not sure if it fits? Email sales@cballast.com with your equipment serial number or photos — we confirm fit before you order.

Product Documentation

Document preview: Pipe Insulation Foam 22mm ID 13mm Wall 2M — Specification sheet

Catalogue entry last verified: 2026-08-20. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy PIPEINS-22X13?
PIPEINS-22X13 can be ordered from cballast.com as a Armacell catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Armacell product?
The manufacturer part number is PIPEINS-22X13.
What is the HS code for PIPEINS-22X13?
The customs tariff (HS) code for PIPEINS-22X13 is 6806.90.
Who manufactures PIPEINS-22X13?
PIPEINS-22X13 is a Armacell product in the Insulation & Lagging range.
Is a datasheet available for PIPEINS-22X13?
Yes — the PIPEINS-22X13 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for PIPEINS-22X13?
The minimum order quantity is 1.
Is PIPEINS-22X13 available?
Yes — PIPEINS-22X13 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).