
Product Description
MILWAUKEE® SAWZALL® blades for metal & wood feature Nail Guard, Fang Tip & Matix II bi-metal teeth for added durability.
Technical Specifications
- Manufacturer part number (MPN)
- 49-22-0240
- Brand
- Milwaukee Tool
- Category
- Accessories
- Pack Qty
- 8
Standards & Compliance
- HS Code
- 8467.22
Cross References
- OEM-URL https://www.milwaukeetool.com/products/details/sawzall-metal-and-wood-blade-set-8pc/49-22-0240
More from Milwaukee

Milwaukee
(4PK) 3/8” x 13” 40 Grit Bandfile Belts
48-80-7040

Milwaukee
(4PK) 3/8” x 13” 40/60/80/120 Grit Bandfile Belts
48-80-7000

Milwaukee
(4PK) 3/8” x 13” 120 Grit Bandfile Belts
48-80-7120

Milwaukee
N95 Respirators
RESPIRATOR

Milwaukee
(4PK) 3/8” x 13” 60 Grit Bandfile Belts
48-80-7060

Milwaukee
N95 Valved Respirator Masks
VALVED-RESPIRATOR

Milwaukee
3/4" Shank to Threaded Steel Hawg® Cutter Arbor
49-57-0030

Milwaukee
(4PK) 3/8” x 13” 80 Grit Bandfile Belts
48-80-7080
Catalogue entry last verified: 2026-10-03.
Frequently asked questions
- Where can I buy 49-22-0240?
- 49-22-0240 can be ordered from cballast.com as a Milwaukee catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Milwaukee product?
- The manufacturer part number is 49-22-0240.
- What is the HS code for 49-22-0240?
- The customs tariff (HS) code for 49-22-0240 is 8467.22.
- Who manufactures 49-22-0240?
- 49-22-0240 is a Milwaukee product in the Tools range.
- What is the minimum order quantity for 49-22-0240?
- The minimum order quantity is 1.
- Is 49-22-0240 available?
- Yes — 49-22-0240 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
- How do I get a price for 49-22-0240?
- Request a quotation with the quote button on this page or by email to sales@cballast.com — we reply within 24 hours with price, availability and lead time.
