
Milwaukee
MX FUEL™ 6" Green Concrete Saw Kit
Part numberMXF316-2XC
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
MILWAUKEE® MX FUEL™ 6” Green Concrete Saw provides clean, consistent cuts with the power to cut 1-1/2” depth on a 6” blade, no gas headaches, and 160 ft of runtime per charge at max cut depth
Technical Specifications
- Manufacturer part number (MPN)
- MXF316-2XC
- Brand
- Milwaukee Tool
Cross References
- OEM-URL https://www.milwaukeetool.com/products/details/mx-fuel-6-green-concrete-saw-kit/mxf316-2xc
More from Milwaukee

Milwaukee
MX FUEL™ 14" Cut-Off Saw w/ RAPIDSTOP™ Brake (Tool Only)
MXF315-0

Milwaukee
MX FUEL™ Demolition Breaker
MXF368-1XC

Milwaukee
MX FUEL CARRY-ON 3600W/1800W Power Supply
MXF002-2XC

Milwaukee
MX FUEL™ Portable Battery Extension
MXF010-0

Milwaukee
MX FUEL™ Handheld Core Drill Kit with Stand
MXF301-2CXS

Milwaukee
MX FUEL Handheld Core Drill Kit
MXF301-2CP

Milwaukee
MX FUEL™ Core Rig w/ Stand Kit
MXF302-2HD

Milwaukee
MX FUEL Sewer drum Machine
MXF500-1CP
Catalogue entry last verified: 2026-09-20.
Frequently asked questions
- Where can I buy MXF316-2XC?
- MXF316-2XC can be ordered from cballast.com as a Milwaukee catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Milwaukee product?
- The manufacturer part number is MXF316-2XC.
- Who manufactures MXF316-2XC?
- MXF316-2XC is a Milwaukee product in the Tools range.
- What is the minimum order quantity for MXF316-2XC?
- The minimum order quantity is 1.
- Is MXF316-2XC available?
- Yes — MXF316-2XC is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
- How do I get a price for MXF316-2XC?
- Request a quotation with the quote button on this page or by email to sales@cballast.com — we reply within 24 hours with price, availability and lead time.
