Master Clip Clamp Band - 60mm, 80mm, stainless
Masterflex

Master Clip Clamp Band - 60mm, 80mm, stainless

Part number001491EAN / GTIN4053863031632HS code7326.90
Control & Automation
Conduit & Trunking
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Master Clip Clamp Band. Tension band PUR/ventilation (Technique / Industrial hoses and couplings / Straps, brackets, clamps, and ear clips). Principal data: span min 60 mm, span max 80 mm, material Stainless. Supplied under manufacturer part number 001491, EAN 4053863031632, HS code 7326.90, country of origin Germany.

Technical Specifications

Product type
Tension band PUR/ventilation
Product group
Industrial hoses and couplings
Span min
60 mm
Span max
80 mm
Material
Stainless
Bandwidth
12 mm
REACH SVHC substance above 0.1%
None
Sales unit
Pack
Carbon footprint (EPD)
0.3428 kg CO2e per pcs
Country of origin
Germany
Customs tariff code (EU CN)
73269098
HS code
7326.90
Manufacturer part number
001491
GTIN (EAN)
4053863031632

Standards & Compliance

HS Code
7326.90

Cross References

  • EAN 4053863031632
  • MPN 001491

Product Documentation

Document preview: Manufacturer's declaration

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 001491?
001491 can be ordered from cballast.com as a Masterflex catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Masterflex product?
The manufacturer part number is 001491.
What is the HS code for 001491?
The customs tariff (HS) code for 001491 is 7326.90.
Who manufactures 001491?
001491 is a Masterflex product in the Control & Automation range.
Is a datasheet available for 001491?
Yes — the 001491 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 001491?
The minimum order quantity is 1.
Is 001491 available?
Yes — 001491 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).