
NAV LED FIL Val 70 5400LM 35W 727 E27
Pricing
Request a quote
We reply within 24 hours
Product Description
LEDVANCE 4099854072017 NAV LED FIL 70 E27 5400 lm, 2700 K, Ra=70, beam angle 360°, IP65, non-dimmable, Clear, 25000 h.
Technical Specifications
- Manufacturer part number (MPN)
- 4099854072017
- EAN / GTIN
- 4099854072017
- Sales unit
- pcs
- Package quantity
- 6 pcs
- Power
- 35 W
- Country of origin
- China
Standards & Compliance
- HS Code
- 8539.52
Cross References
- EAN 4099854072017
- SAP 1200677695
- Code 83123980
Product Documentation
More from LEDVANCE

LEDVANCE
LED-pipe T8 EM 58 4100LM 865 ML S 1500mm
4099854432644

LEDVANCE
Floodlight SEN 20W/840 2400 PS SY100
4099854309526

LEDVANCE
Dampproof 1500 58W/4000K 8000LM IP65
4058075541245

LEDVANCE
Floodlight 100W/830 9150 PS SY100
4099854306082

LEDVANCE
LED Line 78 100 12W 827 R7S DIM
4099854064876

LEDVANCE
Dampproof COMP TH 1500 V 62W 840 IP66
4058075740990

LEDVANCE
NAV LED FIL Val 50 3600LM 21W 727 E27
4099854071973

LEDVANCE
Panel CMP 600 3640LM 26W 830
4099854734441
Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 4099854072017?
- 4099854072017 can be ordered from cballast.com as a LEDVANCE catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this LEDVANCE product?
- The manufacturer part number is 4099854072017.
- What is the HS code for 4099854072017?
- The customs tariff (HS) code for 4099854072017 is 8539.52.
- Who manufactures 4099854072017?
- 4099854072017 is a LEDVANCE product in the Lighting & Electrical Accessories range.
- Is a datasheet available for 4099854072017?
- Yes — the 4099854072017 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 4099854072017?
- The minimum order quantity is 1.
- Is 4099854072017 available?
- Yes — 4099854072017 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
