
Jacob
Nipple M12 (3-6) EMC Brass
Part number50.612 M/EMVEAN / GTIN4024092049361HS code7419.80
Electrical Components
Cable Glands
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Jacob 50.612 M/EMV PERFECT Cable gland in brass EMC M12. Light opening 3-6mm.
Technical Specifications
- Manufacturer part number (MPN)
- 50.612 M/EMV
- EAN / GTIN
- 4024092049361
- Sales unit
- pcs
- Package quantity
- 100 pcs
- Thread size
- M12
Standards & Compliance
- HS Code
- 7419.80
Cross References
- EAN 4024092049361
- SAP 1000226035
- Code 8971164
Product Documentation
Document preview: Nipple M12 (3-6) EMC Brass (50.612 M/Emv) — Specification sheet
More from Jacob

Jacob
Blanking Plug Brass M 32
10.3215 M/G

Jacob
Sealing Ring for Connecting Thread M 12
3M12-D

Jacob
Thread Adapter M50-PG42
M50PG42/OM

Jacob
Enlarging Adapter Nipple PG 13.5 to PG 16, Brass
1316

Jacob
Blanking Plug Polyamide M32
10.3215PA7035

Jacob
Blanking Plug Polyamide M40
10.4015PA7035

Jacob
Blanking Plug Messingpg 13,5
1013 M

Jacob
Enlarging Adapter Nipple PG 21 to PG 29, Brass
2129
Technical guides
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 50.612 M/EMV?
- 50.612 M/EMV can be ordered from cballast.com as a Jacob catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Jacob product?
- The manufacturer part number is 50.612 M/EMV.
- What is the HS code for 50.612 M/EMV?
- The customs tariff (HS) code for 50.612 M/EMV is 7419.80.
- Who manufactures 50.612 M/EMV?
- 50.612 M/EMV is a Jacob product in the Electrical Components range.
- Is a datasheet available for 50.612 M/EMV?
- Yes — the 50.612 M/EMV datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 50.612 M/EMV?
- The minimum order quantity is 1.
- Is 50.612 M/EMV available?
- Yes — 50.612 M/EMV is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
