
Infraplast
Joint Sleeve for Corrugated PIPE 75mm PE SV
Part number3281-75EAN / GTIN7052353281028HS code3917.32
Control & Automation
Conduit & Trunking
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Infraplast 3281-75 Joint sleeve for corrugated pipe 75mm.
Technical Specifications
- Manufacturer part number (MPN)
- 3281-75
- EAN / GTIN
- 7052353281028
- Sales unit
- pcs
Standards & Compliance
- HS Code
- 3917.32
Cross References
- EAN 7052353281028
- SAP 1200663400
- Code 83117540
Product Documentation
Document preview: Joint Sleeve for Corrugated PIPE 75mm PE SV (3281-75) — Specification sheet
More from Infraplast

Infraplast
Joint Sleeve for Corrugated PIPE 125mm PE SV
3281-125

Infraplast
DL Reducing Sleeve Fibre Duct 50/40mm
3280-5040-R-TRANS

Infraplast
Infraplast 3297-50 Pipe Cutter for 50 mm Pipe

Infraplast
DL Reducing Sleeve Fibre Duct 32/20mm
3280-3220-R-TRANS

Infraplast
DL Joint Sleeve Fibre Duct 50mm
3280-50-U-TRANS

Infraplast
1-L SUB FIBRE PIPE 40mm 1500M Green
322040x2,0GR

Infraplast
DV Corrugated PIPE with WIRE 50mm 50M PE OR
3222050-KGOR

Infraplast
1-L DL FIBRE PIPE 20mm 600M Orange
322020x2,0OR-600
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 3281-75?
- 3281-75 can be ordered from cballast.com as a Infraplast catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Infraplast product?
- The manufacturer part number is 3281-75.
- What is the HS code for 3281-75?
- The customs tariff (HS) code for 3281-75 is 3917.32.
- Who manufactures 3281-75?
- 3281-75 is a Infraplast product in the Control & Automation range.
- Is a datasheet available for 3281-75?
- Yes — the 3281-75 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 3281-75?
- The minimum order quantity is 1.
- Is 3281-75 available?
- Yes — 3281-75 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
