IMI FPL Transition Nipple - 3/8", 3/8"
Imi

IMI FPL Transition Nipple - 3/8", 3/8"

Part number53351212EAN / GTIN7318793634603HS code8483.10
Pipes, Fittings & Flanges
Press & Push-Fit Fittings
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

IMI FPL Transition Nipple. FPL connections (Plumbing / Pipes and fittings / Push and compression fittings). Principal data: thread 1 3/8", thread 2 3/8". Supplied under manufacturer part number 53351212, EAN 7318793634603, HS code 8483.10, country of origin Poland.

Technical Specifications

Product type
FPL connections
Product group
Pipes and fittings
Thread 1
3/8"
Thread 2
3/8"
Surface
Chrome-plated
Material
Metal
Pressure PN
16 bar
REACH SVHC substance above 0.1%
Lead
Carbon footprint (EPD)
0.0896 kg CO2e per pcs
Environmental declaration
EPD third-party verified
Country of origin
Poland
Customs tariff code (EU CN)
84831029
HS code
8483.10
Manufacturer part number
53351212
GTIN (EAN)
7318793634603
VVS number
044221012

Standards & Compliance

HS Code
8483.10

Cross References

  • EAN 7318793634603
  • MPN 53351212

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 53351212?
53351212 can be ordered from cballast.com as a Imi catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Imi product?
The manufacturer part number is 53351212.
What is the HS code for 53351212?
The customs tariff (HS) code for 53351212 is 8483.10.
Who manufactures 53351212?
53351212 is a Imi product in the Pipes, Fittings & Flanges range.
Is a datasheet available for 53351212?
Yes — the 53351212 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 53351212?
The minimum order quantity is 1.
Is 53351212 available?
Yes — 53351212 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).