igubal® 4-Hole flange bearing with bearing insert (F205-KS-J3EM-25-17-SP-TP)
igus

igubal® 4-Hole flange bearing with bearing insert

Part numberF205-KS-J3EM-25-17-SP-TPHS code8483.30
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

igubal F KS TP - split four hole flange bearing with iglidur J3 spherical insert bearing, as an alternative to UCF205-UCF208. Assembly and bearing replacement directly on the shaft without dismantling other parts; lubrication-free and maintenance-free; lighter than metal and dirt-repellent.

Technical Specifications

Manufacturer part number (MPN)
F205-KS-J3EM-25-17-SP-TP
Brand
IGUS
Category
Tools
Weight
150.744 g
Housing material
igumid G
Shipping weight (kg or kg/m)
0.150744
Shaft diameter
25 mm
h1
16 mm
b4
17 mm

Standards & Compliance

HS Code
8483.30

Cross References

  • OEM-URL https://www.igus.com/product/igubal_F2xx_KS_TP

Product Documentation

Document preview: igus F205-KS-J3EM-25-17-SP-TP — Data Sheet

Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy F205-KS-J3EM-25-17-SP-TP?
F205-KS-J3EM-25-17-SP-TP can be ordered from cballast.com as a igus catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this igus product?
The manufacturer part number is F205-KS-J3EM-25-17-SP-TP.
What is the HS code for F205-KS-J3EM-25-17-SP-TP?
The customs tariff (HS) code for F205-KS-J3EM-25-17-SP-TP is 8483.30.
Who manufactures F205-KS-J3EM-25-17-SP-TP?
F205-KS-J3EM-25-17-SP-TP is a igus product in the Safety & Detection range.
Is a datasheet available for F205-KS-J3EM-25-17-SP-TP?
Yes — the F205-KS-J3EM-25-17-SP-TP datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for F205-KS-J3EM-25-17-SP-TP?
The minimum order quantity is 1.
Is F205-KS-J3EM-25-17-SP-TP available?
Yes — F205-KS-J3EM-25-17-SP-TP is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).