
Hach
NF300 Pump 12 Month Service Kit
Part number19-KIT-111HS code9027.89
Chemical Test Kits
Water Analysis Meters
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Hach NF300 Pump 12 Month Service Kit. Reference part number 19-KIT-111.
Technical Specifications
- What's included
- Includes: PTFE Diaphragm, NF300 O-Ring, Intermediate Plate, Connection Plate and PTFE Tape
Standards & Compliance
- HS Code
- 9027.89
Product Documentation
Document preview: Hach Manual: User Instructions: NF300 Pump Maintenance Kit (19-KIT-110, 19-KIT-111) (DOC273.53.90678)
More from Hach

Hach
Singlet, Conductivity Std. 1413 µS/cm — KCl, 20 mL, pk/20
2771420

Hach
Singlet, Conductivity Std. 147 µS/cm — KCl, 20 mL, pk/20
2771320

Hach
Singlet, Conductivity Std. 12,88 mS/cm — KCl, 20 mL, pk/20
2771520

Hach
Hach 20 NTU Stablcal Vial TU5 w/o|RFID
LZY899

Hach
Buffer Solution, pH 7.00 Yellow, 50ml
2283526
No image
Hach
pH buffer, 10.01, 500ml Blue — Blue, 500 ml
2283649.99
No image
Hach
pH buffer, 4.01, 500ml Red — Red, 500 ml
2283449.99
No image
Hach
pH buffer, 7.00, 500ml Yellow — Yellow, 500 ml
2283549.99
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 19-KIT-111?
- 19-KIT-111 can be ordered from cballast.com as a Hach catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Hach product?
- The manufacturer part number is 19-KIT-111.
- What is the HS code for 19-KIT-111?
- The customs tariff (HS) code for 19-KIT-111 is 9027.89.
- Who manufactures 19-KIT-111?
- 19-KIT-111 is a Hach product in the Chemical Test Kits range.
- Is a datasheet available for 19-KIT-111?
- Yes — the 19-KIT-111 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 19-KIT-111?
- The minimum order quantity is 1.
- Is 19-KIT-111 available?
- Yes — 19-KIT-111 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
