Grundfos Hydro MPC-E 3 CRIE Pressure Booster System 5-5 U2 A-A-A-GHJ - 2", 52M
Grundfos

Grundfos Hydro MPC-E 3 CRIE Pressure Booster System 5-5 U2 A-A-A-GHJ - 2", 52M

Part number99173787EAN / GTIN5712608089435HS code8501.52
Pumps
Pumps
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Grundfos Hydro MPC-E 3 CRIE Pressure Booster System 5-5 U2 A-A-A-GHJ. Water supply pumps (Plumbing / Heat / Pumps for heating and domestic water). Principal data: connection thread 2", lifting height max 52 m. Supplied under manufacturer part number 99173787, EAN 5712608089435, HS code 8501.52, country of origin Hungary.

Technical Specifications

Product type
Water supply pumps
Product group
Heat
Connection thread
2"
Lifting height max
52 m
Number of pumps
3 pcs
Carbon footprint (EPD)
1.040.0097 kg CO2e per pcs
Country of origin
Hungary
Customs tariff code (EU CN)
85015230
HS code
8501.52
Manufacturer part number
99173787
GTIN (EAN)
5712608089435
VVS number
385553555

Standards & Compliance

HS Code
8501.52

Cross References

  • MPN 99173787
  • EAN 5712608089435
  • VVS 385553555

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 99173787?
99173787 can be ordered from cballast.com as a Grundfos catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Grundfos product?
The manufacturer part number is 99173787.
What is the HS code for 99173787?
The customs tariff (HS) code for 99173787 is 8501.52.
Who manufactures 99173787?
99173787 is a Grundfos product in the Pumps range.
Is a datasheet available for 99173787?
Yes — the 99173787 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 99173787?
The minimum order quantity is 1.
Is 99173787 available?
Yes — 99173787 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).