Grundfos Hydro MPC-E 2 CRIE Pressure Booster System 15-4 U2 A-A-A-GHJ - DN80, 82M
Grundfos

Grundfos Hydro MPC-E 2 CRIE Pressure Booster System 15-4 U2 A-A-A-GHJ - DN80, 82M

Part number99173802EAN / GTIN5712608089848HS code8503.00
Pumps
Pumps
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Grundfos Hydro MPC-E 2 CRIE Pressure Booster System 15-4 U2 A-A-A-GHJ. Water supply pumps (Plumbing / Heat / Pumps for heating and domestic water). Principal data: connection (flanges) DN80, lifting height max 82 m. Supplied under manufacturer part number 99173802, EAN 5712608089848, HS code 8503.00, country of origin Denmark.

Technical Specifications

Product type
Water supply pumps
Product group
Heat
Connection (flanges)
DN80
Lifting height max
82 m
Number of pumps
2 pcs
Carbon footprint (EPD)
1.660.8520 kg CO2e per pcs
Country of origin
Denmark
Customs tariff code (EU CN)
85030091
HS code
8503.00
Manufacturer part number
99173802
GTIN (EAN)
5712608089848
VVS number
385553154

Standards & Compliance

HS Code
8503.00

Cross References

  • MPN 99173802
  • EAN 5712608089848
  • VVS 385553154

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 99173802?
99173802 can be ordered from cballast.com as a Grundfos catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Grundfos product?
The manufacturer part number is 99173802.
What is the HS code for 99173802?
The customs tariff (HS) code for 99173802 is 8503.00.
Who manufactures 99173802?
99173802 is a Grundfos product in the Pumps range.
Is a datasheet available for 99173802?
Yes — the 99173802 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 99173802?
The minimum order quantity is 1.
Is 99173802 available?
Yes — 99173802 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).