
Gates Micro-V K060841 Serpentine Belt
Pricing
Request a quote
We reply within 24 hours
Product Description
Gates Micro-V K060841 serpentine V-ribbed belt, 6 ribs, 84.1" effective length. Drives engine accessories — alternators, water pumps, cooling fans and auxiliary pumps — on diesel and marine auxiliary engines, gensets and industrial drive packages.
Technical Specifications
- Series
- Micro-V
- Ribs
- 6 (K06)
- Effective length
- 84.1" (2136 mm)
- Profile
- PK (ISO 9982)
- Material
- EPDM with aramid cord
- Application
- Multi-accessory serpentine drives
- Metric size
- 6PK2135
Standards & Compliance
- Material
- EPDM / Aramid cord
- HS Code
- 4010.39
Product Documentation
More from Gates

Gates
Gates Micro-V K080965 Serpentine Belt

Gates
Gates MegaSys MegaSpiral 4SP 1/2" Hydraulic Hose (per m)
MEGA4SP-8

Gates
Gates MegaSys MegaSpiral 4SP 3/4" Hydraulic Hose (per m)
MEGA4SP-12
Gates
Gates Male JIC 37° Hydraulic Fitting G25170-0808
Gates
Gates Male JIC 37° Hydraulic Fitting G25170-0606

Gates
Gates Hi-Power II B68 Classical V-Belt

Gates
Gates Hi-Power II A52 Classical V-Belt

Gates
Gates PowerGrip GT3 5GT-710-15 Timing Belt
Catalogue entry last verified: 2026-08-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy K060841?
- K060841 can be ordered from cballast.com as a Gates catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Gates product?
- The manufacturer part number is K060841.
- What is the HS code for K060841?
- The customs tariff (HS) code for K060841 is 4010.39.
- Who manufactures K060841?
- K060841 is a Gates product in the Drives & Motors range.
- Is a datasheet available for K060841?
- Yes — the K060841 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for K060841?
- The minimum order quantity is 1.
- Is K060841 available?
- Yes — K060841 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
