
Foss
Fibre pigtail, LC, 62.5 1.5M, grey
Part number8-78L0-015-EEAN / GTIN7071051002421HS code8544.49
Communications
Coaxial & Network
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Foss 8-78L0-015-E Fibre pigtail, LC, 62.5/125/900, 1.5 m, grey.
Technical Specifications
- Manufacturer part number (MPN)
- 8-78L0-015-E
- EAN / GTIN
- 7071051002421
- Sales unit
- pcs
- Package quantity
- 12 pcs
Standards & Compliance
- HS Code
- 8544.49
Cross References
- EAN 7071051002421
- SAP 1200587412
- Code 82961991
Product Documentation
Document preview: Fibre pigtail, LC, 62.5 1.5M, grey (8-78L0-015-E) — Specification sheet
More from Foss

Foss
Patch cord DPX, SC-LC, SM, 10 m, yellow
8-3B7L-100-E

Foss
CABLEINNG. 4X7MM, BUDI-2S
CZ0929-000

Foss
Patch cord DPX, SC-LC, SM, 3 m, yellow
8-3B7L-030-E

Foss
Patch cord DPX, LC-LC, SM, 1 m, yellow
8-3BLL-010-E

Foss
Patch cord DPX, SC-SC, SM, 3 m, yellow
8-3B77-030-E

Foss
Cabinet 19" 22HE B80XD80
6996268

Foss
Patch cord DPX, SC-LC, SM, 5 m, yellow
8-3B7L-050-E

Foss
Fibre pigtail, SC, 62.5, 1.5M, grey
8-7870-015-E
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 8-78L0-015-E?
- 8-78L0-015-E can be ordered from cballast.com as a Foss catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Foss product?
- The manufacturer part number is 8-78L0-015-E.
- What is the HS code for 8-78L0-015-E?
- The customs tariff (HS) code for 8-78L0-015-E is 8544.49.
- Who manufactures 8-78L0-015-E?
- 8-78L0-015-E is a Foss product in the Communications range.
- Is a datasheet available for 8-78L0-015-E?
- Yes — the 8-78L0-015-E datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 8-78L0-015-E?
- The minimum order quantity is 1.
- Is 8-78L0-015-E available?
- Yes — 8-78L0-015-E is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
