
Esylux
OFL SUN LED 50W 3K black
Part numberEL10810213EAN / GTIN4015120810213HS code9405.42
Lighting & Electrical Accessories
Floodlights
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Esylux EL10810213 LED-floodlights 50 W, ADF-mounting bracket, black.
Technical Specifications
- Manufacturer part number (MPN)
- EL10810213
- EAN / GTIN
- 4015120810213
- Sales unit
- pcs
- Package quantity
- 5 pcs
- Power
- 50 W
- Country of origin
- China
Standards & Compliance
- HS Code
- 9405.42
Cross References
- EAN 4015120810213
- SAP 1000698789
- Code 8414060
Product Documentation
Document preview: OFL SUN LED 50W 3K black (EL10810213) — Specification sheet
More from Esylux

Esylux
Standltau for fall protection
EQ10121616

Esylux
OFL SUN LED 10W 3K black
EL10810015

Esylux
IDL EL2 5W 4K MIL OnOff
EO10298974

Esylux
Esylux SLP-2 Handheld Torch with Emergency Function
EN10050015

Esylux
Emergency lighting SLC EL 3H 25M IR SC/C PM
EN10031595

Esylux
IDL EL2 9W 4K MIL DALI
EO10298936

Esylux
AFL Basic LED 50W 3000K (EL10810886)

Esylux
AFL Basic LED 50W 4000K (EL10810763)
Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy EL10810213?
- EL10810213 can be ordered from cballast.com as a Esylux catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Esylux product?
- The manufacturer part number is EL10810213.
- What is the HS code for EL10810213?
- The customs tariff (HS) code for EL10810213 is 9405.42.
- Who manufactures EL10810213?
- EL10810213 is a Esylux product in the Lighting & Electrical Accessories range.
- Is a datasheet available for EL10810213?
- Yes — the EL10810213 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for EL10810213?
- The minimum order quantity is 1.
- Is EL10810213 available?
- Yes — EL10810213 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
