Ermeto GZ Intermediate Piece steel chromated light - 18mm, 18mm, 400bar
Ermeto

Ermeto GZ Intermediate Piece steel chromated light - 18mm, 18mm, 400bar

Part numberGZ18LCFHS code7307.99
Hydraulics
Hydraulic Fittings
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Ermeto GZ Intermediate Piece steel chromated light. Even (Technique / Hydraulics / Cutting ring fittings). Principal data: pipe dimension 18 mm, pipe dimension 2 18 mm, working pressure 400 bar. Supplied under manufacturer part number GZ18LCF, HS code 7307.99, country of origin Poland.

Technical Specifications

Product type
Even
Product group
Hydraulics
Pipe dimension
18 mm
Pipe dimension 2
18 mm
Working pressure
400 bar
Threaded pipe end
M26 x 1.5
Length
36 mm
Wrench width
32 mm
Safety factor
4:1
Approval
DNV, Bureau Veritas, Lloyd's, DVGW and others
Sales unit
Pack
Carbon footprint (EPD)
1.1948 kg CO2e per pcs
Country of origin
Poland
Customs tariff code (EU CN)
73079910
HS code
7307.99
Manufacturer part number
GZ18LCF

Standards & Compliance

HS Code
7307.99

Cross References

  • MPN GZ18LCF

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy GZ18LCF?
GZ18LCF can be ordered from cballast.com as a Ermeto catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Ermeto product?
The manufacturer part number is GZ18LCF.
What is the HS code for GZ18LCF?
The customs tariff (HS) code for GZ18LCF is 7307.99.
Who manufactures GZ18LCF?
GZ18LCF is a Ermeto product in the Hydraulics range.
Is a datasheet available for GZ18LCF?
Yes — the GZ18LCF datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for GZ18LCF?
The minimum order quantity is 1.
Is GZ18LCF available?
Yes — GZ18LCF is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).