
Elcor
M20(S) UNITEx-E NP Brass Gland
Part number2008.601EAN / GTIN7090062651923HS code8544.42
Electrical Components
Cable Glands
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Elcor 2008.601 M20(S)UNITEx-E NP Brass Gland Ex eb IIC Gb, Ex nR IIC Gc, Ex tb IIIC Db Cable ID 7-12mm,OD 11,5-16mm.
Technical Specifications
- Manufacturer part number (MPN)
- 2008.601
- EAN / GTIN
- 7090062651923
- HS code
- 8544.42
- Sales unit
- pcs
- Cable entry
- M20
Standards & Compliance
- HS Code
- 8544.42
Cross References
- EAN 7090062651923
- SAP 1200942794
- Code 84230495
Product Documentation
Document preview: M20(S) UNITEx-E NP Brass Gland (2008.601) — Specification sheet
More from Elcor

Elcor
M40(m)-M20(fm) NP Brass Reducer
2008.253

Elcor
Flexible Conduit KSU0430 M20, 30M SS316
1400.320

Elcor
M20 Nickel Plated Stopping Plug(Dome)
PDM020E

Elcor
SW-02 Control Switch JB
1000.582

Elcor
Protection kit wall-mounted. Double sealing
1702.117

Elcor
Vortex Injection Resin (24ml)
X109-115

Elcor
M20SS A2EX-VX NP Brass,3-8,5mm
2008.400

Elcor
HT-S 407515 Terminal JB, SS316L
1000.513
Technical guides
Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 2008.601?
- 2008.601 can be ordered from cballast.com as a Elcor catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Elcor product?
- The manufacturer part number is 2008.601.
- What is the HS code for 2008.601?
- The customs tariff (HS) code for 2008.601 is 8544.42.
- Who manufactures 2008.601?
- 2008.601 is a Elcor product in the Electrical Components range.
- Is a datasheet available for 2008.601?
- Yes — the 2008.601 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 2008.601?
- The minimum order quantity is 1.
- Is 2008.601 available?
- Yes — 2008.601 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
