Bottom plate, galvanised, 400X8 (XSPBU0408)
Eaton

Bottom plate, galvanised, 400X8

Part numberXSPBU0408EAN / GTIN4015081177592HS code8538.10
Enclosures
Enclosure Accessories
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Overview

Eaton Bottom plate, galvanised, 400X8 (part number XSPBU0408) is listed under Enclosures / Enclosure Accessories. Sales unit: pcs; Eaton catalogue number: 119919; Depth: 675 mm; Height: 6 mm; Width: 325 mm; Weight: 5.139 kg.

Technical Specifications

Manufacturer part number (MPN)
XSPBU0408
EAN / GTIN
4015081177592
Sales unit
pcs
Eaton catalogue number
119919
Depth
675 mm
Height
6 mm
Width
325 mm
Weight
5.139 kg
Compliances
RoHS conform
RAL-number
0
Color
Stainless steel
Model
Floor plate
Material
Metal
Suitable for enclosure building length/depth
800 mm
Suitable for enclosure building width
400 mm
Suitable for enclosure building depth
800 mm
Colour
Stainless steel
Country of origin
Czechia

Standards & Compliance

HS Code
8538.10

Cross References

  • EAN 4015081177592
  • SAP 1200605887
  • Code 82995846

Product Documentation

Document preview: Bottom plate, galvanised, 400x8 (XSPBU0408) — Specification Data Sheet (OEM)

Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy XSPBU0408?
XSPBU0408 can be ordered from cballast.com as a Eaton catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Eaton product?
The manufacturer part number is XSPBU0408.
What is the HS code for XSPBU0408?
The customs tariff (HS) code for XSPBU0408 is 8538.10.
Who manufactures XSPBU0408?
XSPBU0408 is a Eaton product in the Enclosures range.
Is a datasheet available for XSPBU0408?
Yes — the XSPBU0408 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for XSPBU0408?
The minimum order quantity is 1.
Is XSPBU0408 available?
Yes — XSPBU0408 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).