Front Plate Set V empty xE Main H200 B800 (XME0808C)
Eaton

Front Plate Set V empty xE Main H200 B800

Part numberXME0808CEAN / GTIN4015082903527HS code8538.90
Enclosures
Enclosure Accessories
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Overview

Eaton Front Plate Set V empty xE Main H200 B800 (part number XME0808C) is listed under Enclosures / Enclosure Accessories. Sales unit: pcs; Package quantity: 8 pcs; Eaton catalogue number: 290352; Depth: 700 mm; Height: 15 mm; Width: 200 mm.

Technical Specifications

Manufacturer part number (MPN)
XME0808C
EAN / GTIN
4015082903527
Sales unit
pcs
Package quantity
8 pcs
Eaton catalogue number
290352
Depth
700 mm
Height
15 mm
Width
200 mm
Weight
1.4 kg
Compliances
RoHS conform
Material
Steel
Number of height units
0
Suitable for enclosure building height
200 mm
Suitable for enclosure building width
800 mm
Surface finishing
Powder coating
Country of origin
Czechia

Standards & Compliance

HS Code
8538.90

Cross References

  • EAN 4015082903527
  • SAP 1200605753
  • Code 82998295

Product Documentation

Document preview: Front Plate Set V tom xE Main H200 B800 (XME0808C) — Specification Data Sheet (OEM)

Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy XME0808C?
XME0808C can be ordered from cballast.com as a Eaton catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Eaton product?
The manufacturer part number is XME0808C.
What is the HS code for XME0808C?
The customs tariff (HS) code for XME0808C is 8538.90.
Who manufactures XME0808C?
XME0808C is a Eaton product in the Enclosures range.
Is a datasheet available for XME0808C?
Yes — the XME0808C datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for XME0808C?
The minimum order quantity is 1.
Is XME0808C available?
Yes — XME0808C is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).