Duco Frame square with skirt - 110mm, 1.5TON, Square
Duco

Duco Frame square with skirt - 110mm, 1.5TON, Square

Part number222014110EAN / GTIN5707234134604HS code7325.10
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

Duco Frame square with skirt. Cast iron, gray iron (VA / Drainage and line drainage). Principal data: running pipe 110 mm, load 1.5 Ton, frame type Square. Supplied under manufacturer part number 222014110, EAN 5707234134604, HS code 7325.10, country of origin India.

Technical Specifications

Product type
Cast iron, gray iron
Product group
Drainage and line drainage
Running pipe
110 mm
Load
1.5 Ton
Frame type
Square
Height
61 mm
Width
155 mm
Length
155 mm
Weight
2 kg
Material
Grey cast iron
Skirt diameter
97 mm
Carbon footprint (EPD)
4.3477 kg CO2e per pcs
Country of origin
India
Customs tariff code (EU CN)
73251000
HS code
7325.10
Manufacturer part number
222014110
GTIN (EAN)
5707234134604
VVS number
222014110

Standards & Compliance

HS Code
7325.10

Cross References

  • EAN 5707234134604
  • MPN 222014110

Product Documentation

Document preview: Datasheet

Catalogue entry last verified: 2026-08-20. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 222014110?
222014110 can be ordered from cballast.com as a Duco catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this Duco product?
The manufacturer part number is 222014110.
What is the HS code for 222014110?
The customs tariff (HS) code for 222014110 is 7325.10.
Who manufactures 222014110?
222014110 is a Duco product in the SC009999 range.
Is a datasheet available for 222014110?
Yes — the 222014110 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 222014110?
The minimum order quantity is 1.
Is 222014110 available?
Yes — 222014110 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).