
Product Description
Cimco 142144 is a pulling head bulb with M5 internal thread, sized to fit Ø3.0 mm and Ø4.5 mm glass-fibre fish rods. The bulb rounds the leading end of the rod so it slides through conduit bends and past obstructions without catching. Sold as a spare part accessory. Typical application is cable pulling through conduits and cavities during electrical installation.
Technical Specifications
- Manufacturer part number (MPN)
- 142144
- EAN / GTIN
- 4021103421444
- Sales unit
- pcs
- Accessory
- Yes
- Spare part
- Yes
- Country of origin
- Germany
Standards & Compliance
- HS Code
- 8207.90
Cross References
- EAN 4021103421444
- SAP 1000393695
- Code 81035080
Product Documentation
More from Cimco

Cimco
Cimco Plastic Pipe Shears with Adjustable Stop 225 mm
120208

Cimco
1000V Insulating Floor Mat 1X1MX4MM
140224

Cimco
Cimco KCC 22 Blue Cable Cutter and Stripper Pliers 160 mm

Cimco
TOOL Skulderveske EMPTY
175134

Cimco
Personlig Personal Protective Equipment 5 Parts
140250

Cimco
Universal Ferrule Crimping Pliers 2,5-10MM2
104196

Cimco
1000V AUS Insulated Plastklype 80mm
140179

Cimco
Cimco 112505 Combination Wrench Set 8–19 mm 12 Pieces
Catalogue entry last verified: 2026-09-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 142144?
- 142144 can be ordered from cballast.com as a Cimco catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Cimco product?
- The manufacturer part number is 142144.
- What is the HS code for 142144?
- The customs tariff (HS) code for 142144 is 8207.90.
- Who manufactures 142144?
- 142144 is a Cimco product in the Tools range.
- Is a datasheet available for 142144?
- Yes — the 142144 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 142144?
- The minimum order quantity is 1.
- Is 142144 available?
- Yes — 142144 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
