
Brødr. Berntsen
TRAV.STAG 6X50X1200,Ø18C-C1150 (03-2020-00)
Part number03-2020-00EAN / GTIN7071025008459HS code7326.90
Cables & Wiring
Pole Line Hardware
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
Brødr. Berntsen 03-2020-00.
Technical Specifications
- Manufacturer part number (MPN)
- 03-2020-00
- EAN / GTIN
- 7071025008459
- Sales unit
- pcs
Standards & Compliance
- HS Code
- 7326.90
Cross References
- EAN 7071025008459
- SAP 1000037143
- Code 8517036
Product Documentation
Document preview: TRAV.STAG 6X50X1200,Ø18C-C1150 (03-2020-00) — Specification sheet
More from Brødr. Berntsen

Brødr. Berntsen
TRAV.STAG 6X50X1500,Ø18C-C1450 (03-2030-00)

Brødr. Berntsen
BARD.STAG 16X1000 M/22X250BOLT
06-3011-00

Brødr. Berntsen
Brødr. Berntsen Loop Clamp SA-50
08-9030-00

Brødr. Berntsen
Horisontalstag NEVF 16534-C
04-5050-04

Brødr. Berntsen
Foundation Bolt LT LABB 24X500 14.203
05-4100-00

Brødr. Berntsen
Brødr. Berntsen 04-5050-03 Earthing Lug NEVF 16.532/34-B

Brødr. Berntsen
Piggklammer 102mm (03-1010-00)

Brødr. Berntsen
Foundation Bolt LT LABB 24X600 14.203
05-4110-00
Catalogue entry last verified: 2026-10-03. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 03-2020-00?
- 03-2020-00 can be ordered from cballast.com as a Brødr. Berntsen catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Brødr. Berntsen product?
- The manufacturer part number is 03-2020-00.
- What is the HS code for 03-2020-00?
- The customs tariff (HS) code for 03-2020-00 is 7326.90.
- Who manufactures 03-2020-00?
- 03-2020-00 is a Brødr. Berntsen product in the Cables & Wiring range.
- Is a datasheet available for 03-2020-00?
- Yes — the 03-2020-00 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 03-2020-00?
- The minimum order quantity is 1.
- Is 03-2020-00 available?
- Yes — 03-2020-00 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
