
Bds
BDS ZIA219M Adapter MK2 - Weldon 19mm
Part number7710490219EAN / GTIN4250187500046HS code8207.50
MOQ:1
Pricing
Request a quote
We reply within 24 hours
Product Description
BDS ZIA219M Adapter MK2 - Weldon 19mm. Core drill (Tool / Cutting tool / Live). Supplied under manufacturer part number 7710490219, EAN 4250187500046, HS code 8207.50, country of origin Germany.
Technical Specifications
- Product type
- Core drill
- Product group
- Cutting tool
- Fits with
- Weldon
- Carbon footprint (EPD)
- 3.6329 kg CO2e per pcs
- Country of origin
- Germany
- Customs tariff code (EU CN)
- 82075060
- HS code
- 8207.50
- Manufacturer part number
- 7710490219
- GTIN (EAN)
- 4250187500046
Standards & Compliance
- HS Code
- 8207.50
Cross References
- EAN 4250187500046
- MPN 7710490219
More from Bds

Bds
BDS ZAK120 Center Pin - 123mm

Bds
BDS ZIA332-KN Adapter, MK3 to 32 mm Weldon with Coolant Feed

Bds
BDS KBK Core Drill Set 5 dele - HSS, P - steel (optimal)
7710126031

Bds
BDS ZAP100 Adapter

Bds
BDS POW100 Chip Magnet power worker - 400mm
7796080105

Bds
BDS ZAK090 Center Pin - 90mm

Bds
BDS ZAF003 Adapter
7711410001
Catalogue entry last verified: 2026-09-30. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.
Frequently asked questions
- Where can I buy 7710490219?
- 7710490219 can be ordered from cballast.com as a Bds catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
- What is the manufacturer part number for this Bds product?
- The manufacturer part number is 7710490219.
- What is the HS code for 7710490219?
- The customs tariff (HS) code for 7710490219 is 8207.50.
- Who manufactures 7710490219?
- 7710490219 is a Bds product in the SC009999 range.
- Is a datasheet available for 7710490219?
- Yes — the 7710490219 datasheet can be viewed and downloaded on this page.
- What is the minimum order quantity for 7710490219?
- The minimum order quantity is 1.
- Is 7710490219 available?
- Yes — 7710490219 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).
