ARP Main Stud Kit Subaru EJ257
ARP

ARP Main Stud Kit Subaru EJ257

Part number260-5722Item numberCB-SPEC-033HS code7318.15
ARP
MaterialARP 2000 alloyARP
MOQ:1

Pricing

Request a quote

We reply within 24 hours

Product Description

ARP Main Stud Kit Subaru EJ257 turbo. 4-bolt main cap reinforcement for 500+ HP builds. Used in general machinery assembly, structural steelwork and pressure-boundary flanged joints per DIN, ISO and ASME B18 dimensional standards.

Technical Specifications

Material
ARP 2000 alloy
Standard
ARP
Thread
10mm main + 8mm aux
Approval
ARP
Standards
ASTM A193, ASTM A194, ASTM A193 B7, ASTM A194 2H
HS code
7318.15

Standards & Compliance

Standard
ARP
Material
ARP 2000 alloy
Thread Standard
10mm main + 8mm aux
Classification / Approval
ARP
HS Code
7318.15

Compatibility & Fitment

ARP heat-treated fasteners have stretch-to-yield instruction sheet. Follow ARP lubricant + torque angle protocol for correct preload.

Not sure if it fits? Email sales@cballast.com with your equipment serial number or photos — we confirm fit before you order.

Product Documentation

Document preview: ARP Main Stud Kit Subaru EJ257 — Specification sheet

Catalogue entry last verified: 2026-08-29. A manufacturer datasheet is attached to this entry — confirm application-critical values against it.

Frequently asked questions

Where can I buy 260-5722?
260-5722 can be ordered from cballast.com as a ARP catalogue item: request a quotation on this page or email sales@cballast.com, and the order ships worldwide.
What is the manufacturer part number for this ARP product?
The manufacturer part number is 260-5722.
What is the HS code for 260-5722?
The customs tariff (HS) code for 260-5722 is 7318.15.
Who manufactures 260-5722?
260-5722 is a ARP product in the Fasteners & Hardware range.
Is a datasheet available for 260-5722?
Yes — the 260-5722 datasheet can be viewed and downloaded on this page.
What is the minimum order quantity for 260-5722?
The minimum order quantity is 1.
Is 260-5722 available?
Yes — 260-5722 is available to order: fulfilment is from supplier stock in cBallast's European network, dispatched directly from the warehouse to the customer, with the exact lead time stated in the quotation (reply within 24 hours).