Choosing and running Graco Reactor plural-component proportioners for spray foam and polyurea: what the model grammar means (E, H and A drives; 30/50 output classes; XP pressure classes; Reactor 2 against Reactor 3; Elite packages), how foam and coatings duties push the choice differently, heater and hose sizing against real site conditions, the spare parts and consumables that keep a rig earning, and what a complete RFQ for a machine or a rebuild looks like.
| Element | Meaning | Working consequence |
|---|---|---|
| E / H / A prefix | Electric, hydraulic or air drive | E = site-friendly, generator-driven work (e.g. Reactor 2 E-30 package); H = highest duty cycles and outputs (e.g. Reactor 3 H-50 Elite); A = entry/touch-up class |
| Output number (30 / 40 / 50…) | Output class — the E-30 family sits near ~13.5 kg/min max | Match to gun chamber size and crew pace; chronic max-output running means the machine is undersized |
| XP suffix | High-pressure class (~3500 psi) for polyurea/coatings | Different pumps and ratings — an H-XP2/H-XP3 is a coatings machine first |
| Reactor 2 vs Reactor 3 | Generation: controls, data, platform | Reactor 3 brings the connected ecosystem and refined diagnostics; Reactor 2 packages (e.g. E-30 ES2011) remain fully supported workhorses |
| Elite tier | Premium package content (Xtreme-Wrap hose class, options) | Buys hose durability and convenience — worth it for daily-spray contractors |
| Package voltage (230/400 V) and heater kW | Electrical configuration | Must match the generator or shore supply — the 15 kW heater package needs the amps to feed it |
| Duty | Pressure class | Machine family | Why |
|---|---|---|---|
| SPF insulation (open/closed cell), roofs, walls, tanks | ~2000 psi class | E-30 class electric; H-40/H-50 for high-volume crews | Flow and heater capacity govern yield and ambient-window; closed-cell winter work is the heater stress test |
| Polyurea waterproofing, truck beds, secondary containment | ~3500 psi class (XP) | E-XP2 class; H-XP2/XP3 for production rates | Fast-gel chemistry needs pressure for clean atomisation at temperature |
| Mixed contractor (foam + occasional polyurea) | Size for the coatings days | XP-class machine run gentler on foam days | Downgrading pressure is easy; the reverse is a new machine |
| Marine/industrial maintenance (pipe coating, tank lining) | Per system datasheet | Often XP class + specific gun chambers | Coating systems specify pressure/temperature windows — the machine serves the chemistry, not vice versa |
Generator sizing belongs in this table's margins: the proportioner, both primary heaters, hose heat and the air compressor all draw together at spray start. The package's own electrical data decides — reading it before the site day is cheaper than discovering voltage sag as cold joints and off-ratio events.
Spray chemistry works in a narrow temperature window at the gun. Three heat stages get it there: primary heaters (A and B), the heated hose holding temperature over distance, and the whip hose at the gun. Practical sizing rules: pick the heater kW for the climate and material (winter closed-cell at high flow is the governing case — the 15 kW class package earns its price the first cold morning); pick hose length for the real site geometry, remembering every section adds thermal load and pressure drop; and treat the fluid-temperature sensor and transducers as consumables of the control loop — a Reactor holding ratio but drifting temperature makes bad foam with a green status light. Daily discipline that protects yield: recirculate to temperature before the first pull, TSL in the ISO lube cup (crystallised ISO is the single most common pump killer), drum temperatures managed (agitator/band heaters in the cold), and desiccant on the ISO drum vent because A-side plus moisture equals crystals in the pump and filters.
| Category | Items | Why on the van, not on order |
|---|---|---|
| Gun service | Mix chambers (sized to output), side-seal kits, gaskets, drill bits for ports, gun rebuild kit | The gun is the wear point — a chamber and seals change-out is minutes if the kit is aboard, a lost day if not |
| Pump and lube | TSL fluid, ISO-side lube cup parts, pump repair kits per side | ISO crystallisation does not wait for freight |
| Sensing and control | Pressure transducers, fluid temperature sensor, hose thermocouple/FTS parts | Ratio and temperature assurance — the difference between product and liability |
| Hose | One spare heated section + whip, connection O-rings, insulation wrap | Hose damage on site is routine; the spare section keeps the day alive |
| Filtration and feed | Y-strainer screens (A/B), feed pump service parts, drum fittings | Dirty feed shows up as pressure imbalance alarms an hour into the job |
Troubleshooting shorthand that the spares list answers: pressure imbalance alarm → look at feed (strainers, drum pumps, empty drum) before blaming the machine; off-ratio or crossover → gun chamber/side seals worn or a check stuck — rebuild kit territory; temperature sag at the gun → heater element or hose zone, measured not guessed; ISO pump stiff after a weekend → TSL discipline failed, crystals in the wet cup. Every one of these is van-stock repairable.
A complete inquiry states: duty (foam class or polyurea/coating system, with the system datasheet if special), daily output target and crew pattern, site electrical reality (shore supply or generator, voltage/frequency — our packages run 230/400 V classes), hose length needed, climate (heater sizing), and whether the purchase is machine-only or turnkey (feed pumps, agitator, gun, spares kit). From our range: Reactor 2 E-30 package, 15 kW, heated hose, Xtreme-Wrap (EH2011) and its ES2011 sibling, the E-30 Elite 10 kW package, and Reactor 3 hydraulics — H-50 Elite, H-XP2 Elite polyurea, H-XP3 Elite. Pumps for transfer and supply live in the same programme — see the Graco Husky AODD selection guide.
How buying works at cballast. We quote machines, packages and the van-stock spares list in one quotation, sanity-check electrical and hose configuration against your site description, and support rebuilds with parts lists per serial. Accounts are vetted at onboarding; first order prepaid; established accounts on credit terms with repeat discounts; public bodies and utilities invoiced against purchase order from the first order. RFQs to sales@cballast.com.
Standards and sources referenced: Graco Reactor 2 and Reactor 3 series technical documentation and package data (output, pressure and heater classes as published by the manufacturer); plural-component application practice per system suppliers' datasheets.
Questions on a package configuration or a rebuild list: write to sales@cballast.com. We answer whether or not you buy from us.